Kochi Metro (KMRL) Route Map 2024, History, Timings, Lines, Fares, Tenders, Facts & Stations

Kochi Metro (KMRL) Route Map 2024:- The Kochi Metro, a key Mass Rapid Transit System (MRTS) for Kochi, Kerala’s commercial hub, features an elevated line and 21 stations. The construction of Kochi Metro Phase 1, which spans 25.16 km and connects Aluva to Petta with 22 stations, began in June 2013. The first segment of 13.2 km, from Aluva to Palarivattom, was inaugurated by India’s Prime Minister on June 17, 2017, with commercial operations starting on June 19, 2017.

In 2014, the project was extended to include a 1.92 km stretch from Petta to Tripunithura as part of Phase 1A (Petta to SN Junction) and Phase 1B (SN Junction to Tripunithura), adding three new elevated stations. Kochi Metro’s Phase 2, approved by the Kerala government in July 2018, will cover 11.2 km with 11 stations and has an estimated cost of Rs 2,310 crore. This phase includes a spur line from Jawaharlal Nehru Stadium to Infopark II in Kakkanad. It is currently pending central government approval and may be funded by the Agence Française de Développement (AFD). Future plans for Kochi Metro Phase 3 include potential expansions, such as extending Line-1 northward to Cochin International Airport in Nedumbassery and further to Angamaly. However, detailed planning for this phase has not yet started.

Kochi Metro Route Map 2024

The Kochi Metro is a rapid transit system serving Kochi in Kerala, India, with 25 active stations. For comprehensive information, you can find details on the Kochi Metro route, lines, service timings, first and last trains, route maps, fare charts, top attractions near stations, nearby metro stations, news, and more. Phase I of the Kochi Metro, which became operational on June 17, 2017, features a single line extending 27 km with 22 stations.

This line operates in a semicircular route, initially heading northeast-southwest before turning east. It uses a 750 V direct current supplied via a third rail and operates on 1,435 mm standard gauge tracks. The trains, which consist of three coaches each, can reach speeds of up to 80 km/h and have a headway of 8 minutes. Each station is uniquely themed to showcase Kerala’s diverse culture, including its wildlife, local cuisine, and more.

Kochi Metro (KMRL) Route Map

KMRL Route Map Overview

SpecificationDetails
OperatorKochi Metro Rail Ltd (KMRL)
Operation StartJune 17, 2017
Number of Lines1 Metro Line
Train Length3 Coaches
Number of Stations25 Active Stations
Metro TimingsStarting: 06:00 AM
Ending: 10:30 PM
Category Trending

Read More:- Bengaluru Namma Metro Route Map

History of Kochi Metro

  • 2004: Initial discussions and feasibility studies for a metro rail system in Kochi began as part of the Kochi Water Metro project, aimed at improving urban transportation.
  • 2012: The foundation stone for the Kochi Metro Rail Project was laid by Prime Minister Manmohan Singh on September 13, 2012. This marked the beginning of the project’s formal development.
  • 2014: The detailed project report was finalized, and various approvals were obtained. The project was initially planned in phases, with Phase I being the primary focus.
  • 2015: Construction work for Phase I commenced, which includes the 27.96 km line from Aluva to Tripunithura with 25 stations. The project aimed to alleviate traffic congestion and provide an efficient public transport option for Kochi.
  • 2016: Major milestones in construction were achieved, including the completion of significant stretches of viaduct and the installation of tracks.
  • June 17, 2017: The first stretch of Kochi Metro from Aluva to Palarivattom was inaugurated by Prime Minister Narendra Modi. This marked the official launch of metro services in Kochi.
  • 2018: The Kochi Metro Rail Limited (KMRL) was awarded the “Best Transport Project” by the International Transport Forum for its innovative approach and successful implementation.
  • 2019: The Kochi Metro expanded its services further, including additional stations and improved facilities. The metro system began integrating more advanced features, such as automated ticketing and real-time passenger information systems.
  • February 2020: KMRL introduced a daily feeder shuttle service connecting Aluva Station to Kochi Airport, enhancing connectivity and convenience for commuters.
  • Phase 2: Approved by the Kerala state government, this phase includes the Pink Line (Line-2) from Jawaharlal Nehru Stadium to Infopark II, with construction expected to begin following the bidding process.
  • Ongoing Projects: Future expansions and improvements aim to extend the metro network further, integrating with other modes of transport and enhancing the overall efficiency of urban transit in Kochi.

Check This:- Kolkata Metro Route Map

Kochi Metro Timing and Route Map

  • Start Time: 6:00 AM
  • End Time: 10:30 PM

Kochi Metro Lines

The Kochi Metro is a key rapid transit system designed to enhance urban mobility in the city of Kochi, Kerala. The current operational Phase 1 includes the Blue Line, stretching from Aluva to Tripunithura. This 27.96 km elevated line, inaugurated on June 17, 2017, features 25 stations, each reflecting distinct themes related to Kerala’s rich cultural heritage. Future expansions include Phase 2, which will introduce the Pink Line, connecting Jawaharlal Nehru Stadium to Infopark II.

Kochi Metro Lines

The Kochi Metro is unique in its integration of various transport modes, including rail, road, and water services. Its innovative approach, such as solar energy utilization and women-led management, underscores its commitment to sustainability and efficiency. The metro system’s design and operational features are geared towards improving connectivity, reducing traffic congestion, and offering a reliable public transportation option for the city’s residents and visitors.

Blue Line: Aluva – Tripunithura

  • Length: 27.96 km
  • Type: Elevated
  • Depot: Muttom (23.6 hectares)
  • Number of Stations: 25
  • Station Names: Aluva, Pulinchodu, Companypady, Ambattukavu, Muttom, Kalamassery, Cochin University (CUSAT), Pathadipalam, Edapally, Changampuzha Park, Palarivatom, JLN Stadium, Kaloor, Lissie, M.G. Road, Maharaja’s College, Ernakulam South, Kadavanthra, Elamkulam, Vytila, Thykkoodam, Petta, Vadakkekotta, SN Junction, Tripunithura

Check Here:- Mumbai Metro Route Map

Feeder Shuttle Service (Launched February 2020)

  • Fare: Rs. 50
  • Frequency: Every 40 minutes
  • First Service: 5:00 AM (Airport) / 5:40 AM (Aluva Station)
  • Last Service: 10:30 PM (Airport) / 11:10 PM (Aluva Station)

Pink Line: JLN Stadium

  • Length: 11.2 km
  • Type: Elevated
  • Number of Stations: 11
  • Station Names: Jawaharlal Nehru Stadium (new station box), Palarivattom Junction, Palarivattom Bypass, Chembumukku, Vazhakkala, Padamughal (formerly Kunnumpuram), Kakkanad Junction, Cochin SEZ (Special Economic Zone), Chittethukara, KINFRA (formerly Rajagiri), InfoPark 1 / Smart City 1, and InfoPark 2 / Smart City 2
  • Status: Approved by Kerala’s state government in 2018; bidding for construction not yet started.

Read Here:- Hyderabad Metro Route Map

Kochi Metro Stations Name

StationInterchange/ConnectionsNearby Accommodation
Aluva
Pulinchodu
Companypady
Ambattukavu
Muttom
KalamasseryHotels near Kalamassery
CUSAT
Pathadipalam
EdapallyHotels near Edapally
Changampuzha Park
PalarivattomHotels near Palarivattom
JLN Stadium
KaloorHotels in Kaloor
Town HallErnakulam Town Railway Station
MG Road
Maharaja’s College
Ernakulam SouthErnakulam Junction Railway StationHotels in Ernakulam
Kadavanthra
Elamkulam
Vyttila
Thaikoodam
Pettah
Vadakkekotta
SN Junction

Read Also Check:- Delhi Metro Route Map

Kochi Metro Fare Chart

Kochi Metro Fare Chart

ZoneDistance from OriginFare
F12 kmRs. 10
F25 kmRs. 20
F310 kmRs. 30
F415 kmRs. 40
F520 kmRs. 50
F625 kmRs. 60

Kochi Metro Tenders Name

  • Latest Notices: Available on KMRL’s website
  • News & Details: Covered on the news & construction page

Read Check: –Employees Provident Fund (EPF)

Kochi Metro Major Contractors

ContractContractor
GC: General ConsultantDelhi Metro Rail Corporation (DMRC)
DDC: Detailed Design Consultant for Line-1Egis India
KRS-1: 75 Standard Gauge CoachesAlstom India
Power Supply & TractionArdanuy Ingenieria S.A
KS-1: Signalling, Train Control & TelecommunicationAlstom India
KS-2: Automated Fare Collection (AFC) SystemAxis Bank – Asis Electronik Ve Bilisim Sistemleri JV
KC-02: Viaduct & 6 Stations (Aluva – Kalamassery)Larsen & Toubro
KC-03: Viaduct & 6 Stations (CUSAT – JLN Stadium)Larsen & Toubro
KS-04: Viaduct & 5 Stations (Kaloor – Ernakulum South)Soma Enterprise
KC-05: Viaduct & 5 Stations (Kadavanthara – Petta)Era – Ranken JV
KC-11: Muttom Depot ConstructionMcNally Bharat
DDC: Detailed Design Consultant (Petta – Thrippunithura)LKT Engineering Pvt. Ltd.
KAC-02: Viaduct from Petta to SN Junction & 2 StationsKEC International – China Civil Engineering Construction Corporation (KEC-CCECC) JV
KAC-04: Viaduct from SN Junction to ThrippunithuraKEC – VNC JV
Phase 1B PMC: Petta – ThrippunithuraAarvee Associates Architects Engineers & Consultants
Phase 1B Proof ConsultancySree Giri Consultants
Finishing & Architectural WorksGodrej & Boyce Mfg. Co. Ltd.
KAE-01: E&M Works (Petta – Thripunithura Terminal)Voltas
KAE-02 Lot-1: Elevators for StationsJohnson Lifts Pvt. Ltd
KAE-02 Lot-2: Escalators for StationsSchindler India Pvt. Ltd.
KAE-04: Electrification / Power SupplyLinxon
KAT-01: Track-workVijay Nirman Company (VNC)

Rea Also: –Overthinking Quotes

Interesting Facts about Kochi Metro

  • Integration: Connects rail, road, and water transport.
  • Foundation: Laid by Prime Minister Manmohan Singh in 2012; opened to passengers by Narendra Modi in June 2017.
  • Management: World’s first rapid transit system managed entirely by women.
  • Station Themes: Each station reflects Kerala’s culture and geography.
  • Innovations: Includes social inclusion, solar energy, vertical gardens, and plastic bottle recycling.
  • Kochi 1 Card: Provides a 20% discount on fares and can be used at retail and online stores.
  • Service Hours: Operates from 6 AM to 10:30 PM with Alstom Metropolis trains on Line-1.

FAQ’S

What are the operational timings of the Kochi Metro?

The Kochi Metro operates from 6:00 AM to 10:30 PM daily.

What is the route map for Kochi Metro Phase 1?

The Phase 1 route runs from Aluva to Tripunithura, covering a distance of 27.96 km with 25 stations. Key stations include Aluva, Pulinchodu, Companypady, Ambattukavu, Muttom, Kalamassery, Cochin University (CUSAT), Edapally, Palarivattom, Kaloor, and Ernakulam South.

What are the fares for Kochi Metro?

The fares for Kochi Metro Line-1 are as follows: F1 (Up to 2 km): Rs. 10 F2 (Up to 5 km): Rs. 20 F3 (Up to 10 km): Rs. 30 F4 (Up to 15 km): Rs. 40 F5 (Up to 20 km): Rs. 50 F6 (Up to 25 km): Rs. 60

What are the notable features of the Kochi Metro?

The Kochi Metro is known for its integration of rail, road, and water transport, women-led management, thematic station designs reflecting Kerala’s culture, and innovative features like social inclusion, solar energy use, vertical gardens, and plastic bottle recycling.

Related Posts:-

1300+ Best Instagram Bios

300+ Trending Instagram Hashtags

Vi Recharge Plan 2024 (New)

WhatsApp Group Join Now
Telegram Group Join Now

Leave a Comment